General Description: 

The repairing  of asphalt/concrete streets and sidewalk as well as repairing (as needed) streets, waterlines, and drainage, that were damaged by the 2013 tornado high wind and debris clean-up trucks. Repairs will be 12 feet easement on each side of the road. This Project will provide streets and sidewalk improvements and safety enhancements.

Vendors

Rudy Construction

Maximum Contract Price: 
$74,704.08
Procurement Narrative: 

A City Bid announcement was made on October 9, 2015 for City of Moore Public Works On-Demand Construction Services. Bids were accepted until October 30, 2015 and five submittals were received. Rudy Construction was awarded the contract on November 16, 2015.

Project Updates

  • Removed & disposed curb & gutter for sidewalk ramps
  • Installed sidewalk from Westmoore Dr. to Meench Dr.
  • Backfilled behind sidewalk and ramps

Excavated for sidewalk at Westmoore Drive and 19th Street.