Little River Park Spray Park

Status: Complete
Project Info
Work Order #: 
PF-03-W-LMA
Releasing Department: 
Capital Planning & Resiliency
Effective Date: 
Monday, August 15, 2016
Completion Date: 
Saturday, March 25, 2017
Files
Events

No events have been scheduled for this project.

General Description: 
  • Construction of a 7,500 total square foot Flow-Through Spray Park and Sidewalk per drawings.
  • Spray Park deck integral colored concrete 6,150 square feet to be Tan and Silversmoke Gray or similar.
  • Supply and install Vortex equipment as per drawings.
  • Supply and install water feature piping from Vortex Vault Command Center manifold to water features.
  • Supply and install electrical conduit from controller to activator.
  • Construct an elevated 18” seat wall.
  • Supply and install ten (10) Shades: Three (3) Cantilever Shades and Seven (7) (11x11) Kite Shades
  • Supply and install Six (6) Park Benches.
  • Supply and install Seven (7) UrbanScape Portage (PODN31C Forest Green) Tables.
  • Supply and install a six foot tall black rod iron fence to enclose the Spray Park. The fence will include an ADA compliant swing gate with a latch and lock.  The fence will be capped and will include a concrete weed barrier strip that is 18 inches wide and 4 inches deep along the fence line. The fence will be set six feet from the edge of the Splashpad.
  • Supply and install Bermuda sod around Spray Park.
  • Start-up, programming and operator training by manufacturer’s representative

Vendors

RJR Enterprises

Maximum Contract Price: 
$850,000.00
Procurement Narrative: 

A City Request for Proposal announcement was made on February 9, 2016 for Spray Park for Little River Park. Bids were accepted until April 5, 2016 and four submittals were received. RJR Enterprises was awarded the contract on August 15, 2016.

Project Updates

Construction of structure is 100% complete.

Completion of structure 99% complete.

All the concrete has been poured and completed.

Construction 50% complete, Water and Sewer hooked up, Drain line installed