General Description: 

Project includes reconstruction of Eagle Dr., SW 10th St., Ridgeway Dr., and SW 8th St. The street repair will be a 12 foot easement on each side of the road.

Vendors

Rudy Construction

Maximum Contract Price: 
$4,225,406.82
Procurement Narrative: 

A City Bid announcement was made on October 9, 2015 for City of Moore Public Works On-Demand Construction Services. Bids were accepted until October 30, 2015 and five submittals were received. Rudy Construction was awarded the contract on November 16, 2015.

Project Updates

Removed & replace curb at Little River Parking lot for ramp installation.

Met on site with the City on Thursday, April 27, 2017 about soil erosion near a sidewalk and the sidewalk being undermined. The lack of sodding is the likely cause of the issue.

Construction is nearly completed. The fire hydrant at the approximate half way point of the project needs to be adjusted to grade. Striping has been placed on the roadway portion of the project.

Little River Roadway, Parking Lot, and Water Line

General cleanup on project
Drilling for light pole foundations along Little River Rd.