Infrastructure

Status: Active

Provide material, labor, and equipment to 2,950 linear feet og 6" water line, install 42 existing double services, 17 long double sets, and 4 fire hydrants.

Status: Complete

Provide material, labor, and equipment to 2,264 linear feet of 6" water line, install 30 existing double services, 9 long double set and 4 fire hydrants. 

Status: Complete

Widening of Telephone Road between SW 4th St. and SW 19th St.

Status: Complete

The repairing  of asphalt/concrete streets and sidewalk as well as repairing (as needed) streets, waterlines, and drainage, that were damaged by the 2013 tornado high wind and debris clean-up trucks. Repairs will be 12 feet easement on each side of the road. This Project will provide streets and sidewalk improvements and safety enhancements.

Status: Active

Drainage improvements along Little River including Detention Ponds and Channel Improvements.

Status: Complete

Provide material, labor, and equipment to pipe burst 2,858 LF of 8' sewer line. Rehabilitate 100 VF of sanitary sewer manholes. Install 80 sewer service lines with connections. Pre and Post construction cleaning and televising to be included. Sodding, clearing, and grubbing also included.

Status: Complete

Panel Replacements throughout the Eastmoor Neighborhood on Silverleaf Dr, Bouziden Dr, Avery Dr, Patterson Dr, SE 5th Ct, SE 6th St, SE 7th Ct, SE 8th St, and Eastmoor Ct.

Status: Complete

Panel replacements throughout the JD Estates Neighborhood on SE 5th, 6th, 7th, 8th, Whispering Oaks, Hazelwood, Pinewood, Post Oak, Cottonwood, and S. Bryant streets.

Status: Complete

Street repair and replacement from SE 19th St to SE 4th St, drainage work, and waterline replacement and relocation.

Status: Complete

Provide material, labor, and equipment to replace 2200 linear feet of 6" water line, install 24 existing double services, and 13 long double sets, 4 fire hydrants.